China wholesale Stamping Equipment Manufacturer – Arc chamber for miniature circuit breaker XMCB9 – Ximu

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization to the long-term to build together with shoppers for mutual reciprocity and mutual advantage for Arc Chamber For Ac Contactor, Thermal Magnetic Circuit Breaker, Moulded Case Circuit Breaker Copper Wire, Our company warmly welcome friends from all over the world to visit, investigate and negotiate business.
China wholesale Stamping Equipment Manufacturer – Arc chamber for miniature circuit breaker XMCB9 – Ximu Detail:

Introduction


拆 - 副本

Arc, with high temperature and hard light, appears when the circuit breaker breaks large current. It may burn out the accessories and keep the electricity working when it need to be terminated.

The ARC CHAMBER sucks the arc, divides it into small sections and finally extinguish the arc. And it also helps to cool and ventilate.

Details

3 XMCB9 Circuit breaker parts Arc chamber
4 XMCB9 Arc chute
5 XMCB9 Arc chamber

MODE NO.: XMCB9
MATERIAL: IRON Q195,GREEN(WHITE) VULCANIZED FIBRE PAPER
NUMBER OF GRID PIECE(pc): 14
WEIGHT(g): 19.8
SIZE(mm): 25.5*13.6*21.1
CLADDING & THICKNESS: NICKEL
PLACE OF ORIGIN: WENZHOU, CHINA
APPLICATION: MCB, miniature circuit breaker
BRAND NAME: INTEMANU
SAMPLE: FREE FOR SAMPLE
OEM & ODM: AVAILABLE
LEAD TIME: 10-30 DAYS
PACKING: POLY BAG, CARTON, WOODEN PALLET AND SO ON
PORT: NINGBO, SHANGHAI, GUANGZHOU
MOQ: IT DEPENDS
PAYMENT TERMS: 30% IN ADVANCE AND THE BALANCE AGAINST THE COPY OF B/L
PRODUCTION CAPACITY: 30,000,000 PCS PER MONTH

Production Process


arc chamber04

Advantages

Product Customization

Custom arc chute are available upon request.

① How to customize the arc chute?

Customer offers the sample or technical drawing, our engineer will make few samples for testing in 2 weeks. We will start making the mould after customer checks and confirms the sample.

② How long we take to make a new arc chute?

We need 15 days to make sample for confirming. And making a new mould needs about 45 days.

Company

Our company is a new-type manufacturing and processing enterprise which specializes in the integration of components processing.

We have the independent equipment manufacturing research and development center such as welding equipment, automation equipment, stamping equipment and so on. We also have our own component assembly workshop and welding workshop.

arc chamber01
arc chamber02
arc chamber03


Product detail pictures:

China wholesale Stamping Equipment Manufacturer –  Arc chamber for miniature circuit breaker XMCB9 – Ximu detail pictures

China wholesale Stamping Equipment Manufacturer –  Arc chamber for miniature circuit breaker XMCB9 – Ximu detail pictures


Related Product Guide:
Cooperation

We take "customer-friendly, quality-oriented, integrative, innovative" as objectives. "Truth and honesty" is our management ideal for China wholesale Stamping Equipment Manufacturer – Arc chamber for miniature circuit breaker XMCB9 – Ximu, The product will supply to all over the world, such as: Chile, Pretoria, Ukraine, By continuous innovation, we will present you with more valuable items and services, and also make a contribution for the development of the automobile industry at home and abroad. Both domestic and foreign merchants are strongly welcomed to join us to grow together.
  • We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By EliecerJimenez from Salt Lake City - 2017.06.16 18:23
    The quality of the products is very good, especially in the details, can be seen that the company work actively to satisfy customer's interest, a nice supplier.
    5 Stars By Ellen from moldova - 2018.09.29 13:24

    Related Products